Dear all,
Is there a way to route clock mesh/stripes (including shielding) during floorplanning stage? The same way as power stripes
Thanks,
Aram
Dear all,
Is there a way to route clock mesh/stripes (including shielding) during floorplanning stage? The same way as power stripes
Thanks,
Aram